Chemnitz
Chemnitz | |
|---|---|
![]() Flag ![]() Coat of arms | |
Location of Chemnitz | |
![]() Chemnitz ![]() Chemnitz | |
| Coordinates: 50°50′N 12°55′E / 50.833°N 12.917°E | |
| Country | Germany |
| State | Saxony |
| District | Urban district |
| Government | |
| • Mayor (2020–27) | Sven Schulze[1] (SPD) |
| Area | |
• Total | 220.85 km2 (85.27 sq mi) |
| Elevation | 296 m (971 ft) |
| Population (2023-12-31)[2] | |
• Total | 245,150 |
| • Density | 1,100/km2 (2,900/sq mi) |
| Time zone | UTC+01:00 (CET) |
| • Summer (DST) | UTC+02:00 (CEST) |
| Postal codes | 09001–09247 |
| Dialling codes | 0371
037200 (Wittgensdorf) 037209 (Einsiedel) 03722 (Röhrsdorf) 03726 (Euba) |
| Vehicle registration | C |
| Website | www |
Chemnitz (German: [ˈkɛmnɪts] ⓘ; from 1953 to 1990: Karl-Marx-Stadt [kaʁlˈmaʁksˌʃtat] ⓘ (lit. 'Karl Marx City'); Upper Sorbian: Kamjenica; Czech: Saská Kamenice) is the third-largest city in the German state of Saxony after Leipzig and Dresden, and the fourth-largest city in the area of former East Germany after (East) Berlin, Leipzig, and Dresden.
The city lies in the middle of a string of cities sitting in the densely populated northern foreland of the Elster and Ore Mountains, stretching from Plauen in the southwest via Zwickau, Chemnitz and Freiberg to Dresden in the northeast, and is part of the Central German Metropolitan Region. Located in the Ore Mountain Basin, the city is surrounded by the Ore Mountains to the south and the Central Saxon Hill Country to the north. The city stands on the Chemnitz River, which is formed through the confluence of the rivers Zwönitz and Würschnitz in the borough of Altchemnitz.
The name of the city as well as the names of the rivers are of Slavic origin. Chemnitz is the third-largest city in the Thuringian-Upper Saxon dialect area after Leipzig and Dresden. The city's economy is based on the service sector and manufacturing industry. Chemnitz University of Technology has around 10,000 students.
Chemnitz is known for its many industrial age buildings and monuments,[3] and is the European Capital of Culture of 2025.[4]
Toponymy
Chemnitz is named after the river Chemnitz, the main tributary of the Zwickau Mulde. The word "Chemnitz" derives from the Slavic expression for "stone" (Upper Sorbian: kamjeń), which is the root of the Upper Sorbian designations for the river (Kamjenica; "stony [brook]"), as well as for the city itself (also Kamjenica). The term is composed of the stem kamjeń, and the Slavic feminine suffix -ica. The city is known in Czech as Saská Kamenice and in Polish sometimes as Kamienica Saska.
Chemnitz is one of many places worldwide whose name derives from the Slavic root kamen such as Kamianske and Kamianets-Podilskyi in Ukraine, Kamensk-Uralsky and Kamensk-Shakhtinsky in Russia, Kamenica (Kosovo), Kamienna Góra (Poland), Kamenz (Kamjenc) (Germany), Kamień Pomorski (Poland), Kamieniec Ząbkowicki (Poland), Kamenitsa (Bulgaria), Kamenický Šenov (Czech Republic), Kamieńsk (Poland), Kamenskoye (Russia), and Kamenac (Croatia). Of these, Chemnitz has the largest population.
History

Beginnings
The area was sparsely settled by Slavic tribes related to the modern Sorbs. The placename is first attested for the eponymous local river (1012/18: "Caminizi fluvium"). In 1143, a Benedictine monastery at "Kameniz" was founded, around which a settlement grew. Around 1170, the town was granted the rights of a free imperial city by emperor Frederick I.[5]
Meissen and Saxony
In 1307, the town became subordinate to the Margraviate of Meissen, the predecessor of the Saxon state. In medieval times, Chemnitz became a centre of textile production and trade. More than one third of the population worked in textile production. In 1356 the Margraviate was succeeded by the Electorate of Saxony.
Geologist Georgius Agricola (1494–1555), author of several significant works on mining and metallurgy including the landmark treatise De Re Metallica, became city physician of Chemnitz in 1533 and lived here until his death in 1555. In 1546 he was elected a Burgher of Chemnitz and in the same year also was appointed Burgomaster (lord mayor), serving again in 1547, 1551, and 1553. In spite of having been a leading citizen of the city, when Agricola died in 1555 the Protestant Duke denied him burial in the city's cathedral due to Agricola's allegiance to his Roman Catholic faith. Agricola's friends arranged for his remains to be buried in more sympathetic Zeitz, approximately 50 km away.[6] Chemnitz became a famous trading and textile manufacturing town.
In 1806, with the end of the Holy Roman Empire, the Electorate was renamed as the Kingdom of Saxony, and this survived until the revolutions of 1918 which followed the Armistice ending the First World War.
By the early 19th century, Chemnitz had become an industrial centre (sometimes called "the Saxon Manchester", German: Sächsisches Manchester, pronounced [ˈzɛksɪʃəs ˈmɛntʃɛstɐ] ⓘ). Important industrial companies were founded by Richard Hartmann, Louis Schönherr and Johann von Zimmermann. Chemnitz became a centre of innovation in the kingdom of Saxony and later in Germany. In 1913, Chemnitz had a population of 320,000 and, like Leipzig and Dresden, was larger at that time than today. After losing inhabitants due to the First World War Chemnitz grew rapidly again and reached its all-time peak of 360,250 inhabitants in 1930. Thereafter, growth was stalled by the world economic crisis.
Weimar Republic
As a working-class industrial city, Chemnitz was a powerful center of socialist political organization after the First World War. At the foundation of the German Communist Party the local Independent Social Democratic Party of Germany voted by 1,000 votes to three to break from the party and join the Communist Party behind their local leaders, Fritz Heckert and Heinrich Brandler.[7] In March 1919 the German Communist Party had over 10,000 members in the city of Chemnitz.[8] Chemnitz was one of the big German industrial centers. Due to the export traffic a modern marshalling yard was erected 1929 in Chemnitz-Hilbersdorf. At that time it was a leading city in the European textile market. Auto Union (today Audi) was founded 1932 in Chemnitz.
World War II
Allied bombing destroyed 41 per cent of the built-up area of Chemnitz during the Second World War.[9] Chemnitz contained factories that produced military hardware and a Flossenbürg forced labor subcamp (500 female inmates) for Astra-Werke AG.[10] The oil refinery was a target for bombers during the Oil Campaign of World War II, and Operation Thunderclap attacks included the following raids:
- 14/15 February 1945: The first major raid on Chemnitz used 717 RAF bombers, but due to cloud cover most bombs fell over open countryside.
- 2/3–5 March: USAAF bombers attacked the marshalling yards.[11]
- 5 March: 760 RAF bombers attacked.
The city was occupied by Soviet troops on 8 May 1945.
The headquarters of the auto manufacturer Auto Union was based in Chemnitz from 1932 and its buildings were badly damaged. At the end of the war, the company's executives fled and relocated the company in Ingolstadt, Bavaria, where it evolved into Audi, now a brand within the Volkswagen group.
The World War II bombings left most of the city centre in ruins and post-war, the East German reconstruction included large low-rise (and later high-rise Plattenbau) housing. Some tourist sites were reconstructed during the East German era and after German reunification. Today over 50 % of the city´s buildings date back to before 1950.[12]
GDR

After the dissolution of the Länder (states) in the GDR in 1952, Chemnitz became seat of a district (Bezirk). On 10 May 1953, the city was renamed by decision of the East German government to Karl-Marx-Stadt (German: Karl Marx City) after Karl Marx, in recognition of its industrial heritage and the Karl Marx Year marking the 135th anniversary of his birth and the 70th anniversary of his death.[13] GDR Prime Minister Otto Grotewohl said:
The people who live here do not look back, but look forward to a new and better future. They look at socialism. They look with love and devotion to the founder of the socialist doctrine, the greatest son of the German people, to Karl Marx. I hereby fulfill the government's decision. I carry out the solemn act of renaming the city and declare: From now on, this city bears the proud and mandatory name Karl-Marx-Stadt.[14]
After the city centre was destroyed in World War II, the East German authorities attempted to rebuild it to symbolise the conceptions of urban development of a socialist city. The layout of the city centre at that time was rejected in favour of a new road network. However, the original plans were not completed. In addition, the rapid development of housing took priority over the preservation of old buildings. So in the 1960s and 1970s, both in the centre as well as the periphery, large areas were built in Plattenbau apartment-block style, for example Yorckstraße. The old buildings of the period, which still existed especially in the Kassberg, Chemnitz-Sonnenberg and Chemnitz-Schloßchemnitz quarters, were neglected and fell increasingly into dereliction.
After reunification


On 23 April 1990, a referendum on the future name of the city was held: 76% of the voters voted for the old name "Chemnitz". On 1 June 1990, the city was officially renamed.[15]
After the reunification of Germany on 3 October 1990, the city of Chemnitz faced several difficult tasks. Many inhabitants migrated to the former West Germany and unemployment in the region increased sharply; in addition Chemnitz did not have adequate shopping facilities, but this was increasingly demanded.[16] Large shopping centers were constructed around the city's periphery in the early 1990s.
Chemnitz is the only major German city whose centre was re-planned after 1990, similar to the reconstruction of several other German cities in the immediate post-war years. Plans for the recovery of a compressed city centre around the historic town hall in 1991 led to an urban design competition. This was announced internationally by the city and carried out with the help of the partner city of Düsseldorf. The mooted project on an essentially unused area of the former city would be comparable in circumference with the Potsdamer Platz in Berlin.[16]
Numerous internationally renowned architects such as Hans Kollhoff, Helmut Jahn and Christoph Ingenhoven provided designs for a new city centre. The mid-1990s began the development of the inner city brownfield around the town hall to a new town. In Chemnitz city more than 66,000 square meters of retail space have emerged. With the construction of office and commercial building on the construction site "B3" at the Düsseldorf court, the last gap in 2010 was closed in city centre image. The intensive development included demolition of partially historically valuable buildings from the period and was controversial.[17][18] Between 1990 and 2007 more than 250 buildings were leveled.

In late August 2018 the city was the site of a series of protests that attracted at least 8,000 people. The protests were attended by far-right and Neo-Nazi groups. News outlets reported about mob violence and riots. The protests started after two immigrants from the Middle East were arrested in connection with the murder of Daniel H., a 35 year old German man, the son of a German mother and a Cuban father, which had happened on 26 August. Violent clashes occurred between far-right protesters and far-left counter protesters, leading to injuries. The mobs outnumbered the local police presence. There were reports that rightist protesters chased down dark skinned bystanders and those that appeared to be foreigners on the streets before more police arrived and intervened. The riots were widely condemned by media outlets and politicians throughout Germany, and were "described as reminiscent of civil war and Nazi pogroms."[19][20][21][22]
The reports of mob violence and riots were criticized as incorrect later on. The German language Swiss newspaper Neue Zürcher Zeitung corrected its earlier reports, stating that there had evidently been no mob violence but there have been sporadic encroachments.[23] Minister President of Saxony Michael Kretschmer came to the same conclusion: "there were no mobs and man hunts".[24]
One week after the protests, a free "Concert against the Right" under the motto "We are more" (#wirsindmehr) attracted an audience of some 65,000 people.[25] A one-minute silence commemorated the murdered Daniel H., the son of a German mother and a Cuban father.[26] The concert itself has been criticized for far-left activities and violent song texts of some of the participating bands.[27][28]
Culture and sights
The city won the bid to be one of the two European Capitals of Culture (in 2025) on 28 October 2020, beating Hanover, Hildesheim, Magdeburg and Nuremberg.[29]
Theater Chemnitz offers a variety of theatre: opera (opera house from 1909), plays, ballet and Figuren (puppets), and runs concerts by the orchestra Robert-Schumann-Philharmonie (founded 1832).
Tourist sights include the Kassberg neighborhood with 18th and 19th century buildings and the Karl Marx Monument by Lev Kerbel, nicknamed Nischel (a Saxon dialect word for head) by the locals. Landmarks include the Old Town Hall with its Renaissance portal (15th century), the castle on the site of the former monastery, and the area around the opera house and the old university. The most conspicuous landmark is the red tower built in the late 12th or early 13th century as part of the city wall.
The Chemnitz petrified forest is located in the courtyard of Kulturkaufhaus Tietz. It is one of the very few in existence, and dates back several million years (details shown in the Museum of Natural Sciences "Museum für Naturkunde Chemnitz", founded 1859). Also within the city limits, in the district of Rabenstein, is the smallest castle in Saxony, Rabenstein Castle.
The city has changed considerably since German reunification. Most of its industry is now gone and the core of the city has been rebuilt with many shops as well as huge shopping centres. Many of these shops are international brands, including Zara, H&M, Esprit, Galeria Kaufhof, Leiser Shoes, and Peek & Cloppenburg. The large Galerie Roter Turm (Red Tower) shopping centre is very popular with young people.
The Chemnitz Industrial Museum is an Anchor Point of ERIH, the European Route of Industrial Heritage. Additional unique industrial monuments are located at the "Schauplatz Eisenbahn" (Saxon Railway Museum and Museum of Technology Rope Shunting System) in Chemnitz-Hilbersdorf. The State Museum of Archaeology Chemnitz[30] opened in 2014 and is located in the former Schocken Department Stores (architect: Erich Mendelsohn; opening of the department store: 1930).
The Museum Gunzenhauser, formerly a bank, opened on 1 December 2007. Alfred Gunzenhauser, who lived in Munich, had a collection of some 2,500 pieces of modern art, including many paintings and drawings by Otto Dix, Karl Schmidt-Rottluff and others. The other great art museum in Chemnitz is located near central railway station, it is called "Museum am Theaterplatz" (erected 1909 as "König-Albert-Museum"). The Botanischer Garten Chemnitz is a municipal botanical garden, and the Arktisch-Alpiner Garten der Walter-Meusel-Stiftung is a non-profit garden specializing in arctic and alpine plants. Near the city center is the "Villa Esche" located (Henry-van-de-Velde-museum). This historical house was built in 1902 in art-nouveau-style by van de Velde.
The City is home of the SCHLINGEL International Film Festival, a yearly festival created in 1996 and that focuses on cinema for young audiences.[31]
Image gallery
-
Old and new city hall -
Red tower
-
Chemnitz Opera at Opernplatz -
St. Petri church
-
Lutheran church -
Castle church over the Castle Lake
-
The Mercure Hotel, tallest building in Chemnitz -
The Transparent department store -
View over Falkeplatz at night -
.jpg)
-
Bust of Karl Marx, the city's former namesake -

-
Gründerzeit quarter Kaßberg
-
View over the city halls and the inner city -
Chemnitz-Kulturhaus -
Watercastle Klaffenbach -
Chemnitz Stadtbad
-
Guest houses at Castle park -
Chemnitz petrified forest inside the Kulturkaufhaus Tietz -

-
State Museum of Archaeology Chemnitz
Climate
Chemnitz has an oceanic climate (Köppen: Cfb; Trewartha: Dobk). The annual precipitation is 732.7 mm (28.85 in), and the precipitation in summer is about twice that in winter.
The Chemnitz weather station has recorded the following extreme values:[32]
- Its highest temperature was 37.8 °C (100.0 °F) on 20 August 2012.
- Its lowest temperature was −28.4 °C (−19.1 °F) on 11 February 1956.
- Its greatest annual precipitation was 1,017.7 mm (40.07 in) in 1941.
- Its least annual precipitation was 426.1 mm (16.78 in) in 1943.
- The longest annual sunshine was 2,119 hours in 2011.
- The shortest annual sunshine was 1,077.7 hours in 1977.
| Climate data for Chemnitz (1991–2020 normals, extremes 1882–present) | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Year |
| Record high °C (°F) | 16.0 (60.8) |
19.5 (67.1) |
24.5 (76.1) |
29.5 (85.1) |
32.2 (90.0) |
36.2 (97.2) |
36.6 (97.9) |
37.8 (100.0) |
34.3 (93.7) |
27.7 (81.9) |
21.9 (71.4) |
17.8 (64.0) |
37.8 (100.0) |
| Mean maximum °C (°F) | 10.4 (50.7) |
12.2 (54.0) |
16.9 (62.4) |
22.6 (72.7) |
26.3 (79.3) |
29.8 (85.6) |
31.1 (88.0) |
31.0 (87.8) |
26.1 (79.0) |
21.8 (71.2) |
15.1 (59.2) |
11.0 (51.8) |
32.9 (91.2) |
| Mean daily maximum °C (°F) | 2.7 (36.9) |
3.7 (38.7) |
7.6 (45.7) |
13.1 (55.6) |
17.5 (63.5) |
20.8 (69.4) |
23.3 (73.9) |
23.2 (73.8) |
18.1 (64.6) |
12.9 (55.2) |
7.2 (45.0) |
3.7 (38.7) |
12.8 (55.0) |
| Daily mean °C (°F) | 0.2 (32.4) |
0.8 (33.4) |
3.9 (39.0) |
8.7 (47.7) |
12.9 (55.2) |
16.0 (60.8) |
18.2 (64.8) |
18.1 (64.6) |
13.8 (56.8) |
9.2 (48.6) |
4.4 (39.9) |
1.2 (34.2) |
8.9 (48.0) |
| Mean daily minimum °C (°F) | −2.3 (27.9) |
−2.0 (28.4) |
0.7 (33.3) |
4.4 (39.9) |
8.2 (46.8) |
11.4 (52.5) |
13.4 (56.1) |
13.6 (56.5) |
9.9 (49.8) |
6.1 (43.0) |
1.9 (35.4) |
−1.1 (30.0) |
5.3 (41.5) |
| Mean minimum °C (°F) | −12.2 (10.0) |
−9.8 (14.4) |
−5.3 (22.5) |
−2.3 (27.9) |
2.3 (36.1) |
6.1 (43.0) |
8.6 (47.5) |
8.3 (46.9) |
4.6 (40.3) |
−0.3 (31.5) |
−4.5 (23.9) |
−9.0 (15.8) |
−14.1 (6.6) |
| Record low °C (°F) | −28.3 (−18.9) |
−28.4 (−19.1) |
−23.1 (−9.6) |
−10.6 (12.9) |
−4.0 (24.8) |
0.5 (32.9) |
4.1 (39.4) |
3.3 (37.9) |
−2.3 (27.9) |
−8.7 (16.3) |
−17.5 (0.5) |
−25.6 (−14.1) |
−28.4 (−19.1) |
| Average precipitation mm (inches) | 48.1 (1.89) |
38.9 (1.53) |
51.5 (2.03) |
40.7 (1.60) |
66.0 (2.60) |
72.8 (2.87) |
95.4 (3.76) |
89.9 (3.54) |
63.4 (2.50) |
57.8 (2.28) |
55.1 (2.17) |
53.2 (2.09) |
732.7 (28.85) |
| Average extreme snow depth cm (inches) | 16.3 (6.4) |
16.1 (6.3) |
9.1 (3.6) |
1.9 (0.7) |
0 (0) |
0 (0) |
0 (0) |
0 (0) |
0 (0) |
0.7 (0.3) |
5.5 (2.2) |
11.8 (4.6) |
26.0 (10.2) |
| Average precipitation days (≥ 0.1 mm) | 16.6 | 15.0 | 16.6 | 12.5 | 14.4 | 14.2 | 15.1 | 13.7 | 12.8 | 14.3 | 15.2 | 17.6 | 178.1 |
| Average snowy days (≥ 1.0 cm) | 15.1 | 14.3 | 7.8 | 1.3 | 0 | 0 | 0 | 0 | 0 | 0.3 | 4.3 | 10.6 | 56.8 |
| Average relative humidity (%) | 83.5 | 80.5 | 77.2 | 69.3 | 70.6 | 72.2 | 69.8 | 69.0 | 76.1 | 80.3 | 84.4 | 84.5 | 76.7 |
| Mean monthly sunshine hours | 66.1 | 84.7 | 124.2 | 180.9 | 211.3 | 212.1 | 227.0 | 214.5 | 158.7 | 121.2 | 69.4 | 59.8 | 1,729.8 |
| Source 1: NOAA[33] | |||||||||||||
| Source 2: Deutscher Wetterdienst / SKlima.de[32] | |||||||||||||
Administrative divisions
The city of Chemnitz consists of 39 neighborhoods. The neighborhoods of Einsiedel, Euba, Grüna, Klaffenbach, Kleinolbersdorf-Altenhain, Mittelbach, Röhrsdorf and Wittgensdorf are at the same time localities within the meaning of Sections 65 to 68 of the Saxon Municipal Code. These neighborhoods came in the wake of the last incorporation wave after 1990 as formerly independent municipalities to the city of Chemnitz and therefore enjoy this special position compared to the other parts of the city. These localities each have a local council, which, depending on the number of inhabitants of the locality concerned, comprises between ten and sixteen members as well as a chairman of the same. The local councils are to hear important matters concerning the locality. A final decision is, however, incumbent on the city council of the city of Chemnitz.[34] The official identification of the districts by numbers is based on the following principle: Starting from the city center (neighborhoods Zentrum and Schloßchemnitz), all other parts of the city are assigned clockwise in ascending order the tenth place of their index, the one-digit is awarded in the direction of city periphery in ascending order.

¹ also a locality |
The city area does not include a unified, closed settlement area after numerous incorporations. The rural settlements of mainly eastern districts are separated from the settlement area of the Chemnitz city center, whereas this partly continues over the western city limits to Limbach-Oberfrohna and Hohenstein-Ernstthal.
Politics
Mayor
The first freely elected mayor after German reunification was Dieter Noll of the Christian Democratic Union (CDU), who served from 1990 to 1991, followed by Joachim Pilz (CDU) until 1993. The mayor was originally chosen by the city council, but since 1994 has been directly elected. Peter Seifert of the Social Democratic Party (SPD) served from 1993 until 2006. Between 2006 and 2020 Barbara Ludwig (SPD) has served as mayor. Sven Schulze (SPD) was elected mayor in 2020.[1]
The most recent mayoral election was held on 20 September 2020, with a runoff held on 11 October, and the results were as follows:
| Candidate | Party | First round | Second round | |||
|---|---|---|---|---|---|---|
| Votes | % | Votes | % | |||
| Sven Schulze | Social Democratic Party | 22,241 | 23.1 | 31,749 | 34.9 | |
| Almut Patt | Christian Democratic Union | 20,630 | 21.4 | 20,047 | 22.0 | |
| Susanne Schaper | The Left | 14,584 | 15.1 | 14,668 | 16.1 | |
| Ulrich Oehme | Alternative for Germany | 11,731 | 12.2 | 12,034 | 13.2 | |
| Lars Faßmann | Independent | 11,470 | 11.9 | 12,515 | 13.8 | |
| Volkmar Zschocke | Alliance 90/The Greens | 6,811 | 7.1 | Withdrew | ||
| Matthias Eberlein | Free Voters | 3,394 | 3.5 | Withdrew | ||
| Paul Vogel | Die PARTEI | 1,527 | 1.6 | Withdrew | ||
| Valid votes | 96,428 | 99.5 | 91,017 | 99.7 | ||
| Invalid votes | 489 | 0.5 | 285 | 0.3 | ||
| Total | 96,917 | 100.0 | 91,302 | 100.0 | ||
| Electorate/voter turnout | 194,952 | 49.7 | 194,850 | 46.9 | ||
| Source: Wahlen in Sachsen | ||||||
City council
The most recent city council election was held on 9 June 2024, and the results were as follows:
| Party | Votes | % | +/- | Seats | +/- | |
|---|---|---|---|---|---|---|
| Alternative for Germany (AfD) | 86,198 | 24.3 | 15 | |||
| Christian Democratic Union (CDU) | 75,727 | 21.3 | 13 | |||
| Sahra Wagenknecht Alliance (BSW) | 53,441 | 15.0 | New | 8 | New | |
| Social Democratic Party (SPD) | 43,922 | 12.4 | 7 | |||
| The Left (Die Linke) | 26,984 | 7.6 | 5 | |||
| Alliance 90/The Greens (Grüne) | 25,833 | 7.3 | 4 | |||
| Pro Chemnitz/Free Saxons (Pro C/FS) | 17,557 | 4.9 | 3 | |||
| Free Democratic Party (FDP) | 12,759 | 3.6 | 2 | |||
| Citizen Alliance Solidarity (BBS) | 2,656 | 0.7 | New | 0 | New | |
| Valid votes | 121,838 | 98.5 | ||||
| Invalid votes | 1,804 | 1.5 | ||||
| Total | 123,642 | 100.0 | 59 | |||
| Electorate/voter turnout | 189,189 | 65.4 | ||||
| Source: Wahlen in Sachsen | ||||||
Urban renewal

Heavy destruction in World War II as well as post-war demolition to erect a truly socialist city centre left the city with a vast open space around its town hall where once a vibrant city heart had been. Because of massive investment in out-of-town shopping right after reunification, it was not until 1999 that major building activity was started in the centre. Comparable to Potsdamer Platz in Berlin, a whole new quarter of the city was constructed in recent years. New buildings include the Kaufhof department store by Helmut Jahn, Galerie Roter Turm with a façade by Hans Kollhoff and Peek & Cloppenburg clothing store by Ingenhofen and Partner.
Economy
Chemnitz is the largest city of the Chemnitz-Zwickau urban area and is one of the most important economic areas of Germany's new federal states. Chemnitz had a GDP of €8.456 billion in 2016, with GDP per capita at €34,166.[35] Since about 2000, the city's economy has recorded high annual GDP growth rates; Chemnitz is among the top ten German cities in terms of growth rate. The local and regional economic structure is characterized by medium-sized companies, with the heavy industrial sectors of mechanical engineering, metal processing, and vehicle manufacturing as the most significant industries.
About 100,000 people are employed, of whom about 46,000 commute from other municipalities.[36] 16.3% of employees in Chemnitz have a university or college degree, twice the average rate in Germany.
Image gallery
-
Volkswagen is the largest employer in the Chemnitz-Zwickau Agglomeration. -

-
The Klinikum Chemnitz GmbH is the largest hospital in the former East German states and the second biggest employer in Chemnitz. -
Chemnitz is a shopping destination. Photo shows the Peek & Cloppenburg store in the city centre. -
Chemnitz is the centerpiece of tourism in the Ore Mountains.
Demographics
| Year | Pop. | ±% |
|---|---|---|
| 1466 | 3,455 | — |
| 1801 | 10,835 | +213.6% |
| 1852 | 35,163 | +224.5% |
| 1871 | 68,229 | +94.0% |
| 1885 | 110,817 | +62.4% |
| 1900 | 206,913 | +86.7% |
| 1905 | 244,927 | +18.4% |
| 1910 | 287,807 | +17.5% |
| 1913 | 326,075 | +13.3% |
| 1916 | 285,285 | −12.5% |
| 1920 | 313,444 | +9.9% |
| 1930 | 361,200 | +15.2% |
| 1933 | 348,720 | −3.5% |
| 1940 | 332,200 | −4.7% |
| 1945 | 243,613 | −26.7% |
| 1950 | 293,373 | +20.4% |
| 1955 | 290,153 | −1.1% |
| 1960 | 286,329 | −1.3% |
| 1965 | 295,160 | +3.1% |
| 1970 | 299,411 | +1.4% |
| 1975 | 305,113 | +1.9% |
| 1980 | 317,644 | +4.1% |
| 1985 | 315,452 | −0.7% |
| 1990 | 294,244 | −6.7% |
| 1995 | 266,737 | −9.3% |
| 2001 | 255,798 | −4.1% |
| 2011 | 240,253 | −6.1% |
| 2022 | 240,078 | −0.1% |
| Population size may be affected by changes in administrative divisions.
Source for 2001–2022: [37] | ||

Chemnitz has a population of 246,000 people and is the 3rd largest city in Saxony. The population of Chemnitz grow rapidly since the early 1900s due to its industrialization. Chemnitz reached its highest peak of population in 1930 with population of about 362,000. Chemnitz in the East Germany era when the city was called "Karl-Marx-Stadt", it became a significant industrial city known for it textile and leather industries. Chemnitz was also the 4th largest city in then East Germany after East Berlin, Leipzig and Dresden. After the German Reunification Chemnitz faced a significant population decrease. Since 1988 Chemnitz has lost about 20 percent of its inhabitants. Chemnitz's population decreased from 300,000 in 1989 to under 250,000 in 2003, which made Chemnitz one of the cities with most population loss in Germany. Chemnitz's population started to grow again in the 2010s due to its immigration from mostly war active countries like Syria but it faced a problem due to many right-wing extremists and active Neo-Nazi groups where many foreigners experience racism and moved away from Chemnitz. The city had a fertility rate of 1.64 in 2015.[38]
Foreign population in Chemnitz by nationality as of 31 December 2022:
| Rank | Nationality | Population (31.12.2022) |
|---|---|---|
| 1 | 3,465 | |
| 2 | 2,915 | |
| 3 | 2,340 | |
| 4 | 1,460 | |
| 5 | 1,384 | |
| 6 | 1,287 | |
| 7 | 1,246 | |
| 8 | 1,235 | |
| 9 | 1,145 | |
| 10 | 1,077 |
A large contributor to the city's foreign population is Chemnitz University of Technology. In 2017, out of its 10,482 students, 2712 were foreign students, which equals to about 25%, making Chemnitz the most internationalised of the three major universities of Saxony.[39]
Languages
- Standard German
- Chemnitz dialect, which is a variety of Upper Saxon German[40]
Transport

Roads
Chemnitz is linked to two motorways (Autobahns), A4 Erfurt – Dresden and A72 Hof – Leipzig. The motorway junction Kreuz Chemnitz is situated in the northwestern area of the city. The motorway A72 between Borna and Leipzig is still under construction. Within the administrative area of Chemnitz there are eight motorway exits (Ausfahrt). The A4 motorway is part of the European route E40, one of the longest European E roads, connecting Chemnitz with the Asian Highway system to the east and France to the west.
Public transport
Public transport within Chemnitz is provided with tram and bus, as well as by the Stadtbahn. Nowadays, the city and its surroundings are served by one Stadtbahn line, five lines of the Chemnitz tramway network, 27 city bus lines, as well as several regional bus lines. At night, the city is served by two bus lines, two tram lines, and the Stadtbahn line.
Chemnitz Hauptbahnhof is the main station for the city. In June 2022, an intercity connection from Chemnitz via Dresden and Berlin to Rostock-Warnemünde was established again for the first time since 2006. Prior to this, Chemnitz was for a long time the largest German city without a connection of long-distance intercity services. 2 RegionalExpress routes connected Chemnitz to the larger cities of Saxony (RE3 from Dresden Hbf via Chemnitz to Hof & RE6 to Leipzig Hbf). In addition, 4 RegionalBahn and 4 CityBahn routes also operate from the Hauptbahnhof.
The length of the tram, Stadtbahn and bus networks is 28.73 km (17.85 mi), 16.3 km (10.13 mi) and 326.08 km (202.62 mi) respectively. In August 2012, electro-diesel trams were ordered from Vossloh, to support an expansion of the light rail network to 226 km (140 mi), with new routes serving Burgstädt, Mittweida and Hainichen.[41]
Airports
Three airports are near Chemnitz, including the two international airports of Saxony in Dresden and Leipzig. Both Leipzig/Halle Airport and Dresden Airport are about 70 km (43 mi) from Chemnitz and offer numerous continental as well as intercontinental flights.
Chemnitz also has a small commercial airport (Flugplatz Chemnitz-Jahnsdorf about 13.5 km (8.4 mi) south of the city. When its current upgrade is completed it will have an asphalt runway 1,400 m (4,600 ft) long and 20 m (66 ft) wide.
-
Chemnitz Hauptbahnhof, the main train station of Chemnitz -
Tram stop at the main tram and bus station at night -
A tram in Chemnitz -
The small commercial airport Flugplatz Chemnitz-Jahnsdorf
Sports

- BV Chemnitz 99 (basketball, men)
- Chemnitzer FC (football)
- Chemnitzer PSV (football, handball, volleyball)
- Chemcats Chemnitz (basketball, women)
- VfB Fortuna Chemnitz (football)
- Post SV Chemnitz (swimming)
- Schwimmclub Chemnitz v. 1892 e.V. (swimming)
- TSV Einheit Süd Chemnitz (swimming, gymnastics, volleyball, skittles)
- ERC Chemnitz e.V. (ice hockey, skater hockey)
- CTC-Küchwald (tennis)
- Floor Fighters Chemnitz (floorball)
- ESV LOK Chemnitz (luge)
- Chemnitzer EC (figure skating, ice dancing, curling)
- Chemnitz Crusaders (American football)
- Tower Rugby Chemnitz (rugby)
- SV Eiche Reichenbrand (football)
- USG Chemnitz e.V. abt Cricket Club (cricket)[42]
Notable people
- Paul Oswald Ahnert (1897–1989), astronomer
- Brigitte Ahrens (born 1945), pop singer
- Olaf Altmann (born 1960), scenic designer
- Mark Arndt (born 1941), Russian Orthodox Archbishop
- Michael Ballack (born 1976), German footballer, former captain of Bayern Munich and Germany
- Veronika Bellmann (born 1960), politician
- Fritz Bennewitz (1926–1995), theater director
- Gerd Böckmann (born 1944), television actor and director
- Werner Bräunig (1934–1976), writer
- Marianne Brandt (1893–1983), artist, designer
- Valery Bykovsky (1934–2019), Soviet cosmonaut
- C418 (real name Daniel Rosenfeld, born 1989), music producer and sound engineer for Minecraft and Wanderstop
- Hans Carl von Carlowitz (1645–1714), forest scientist
- Max Eckert-Greifendorff (1868–1938), cartographer and professor
- Gerson Goldhaber (1924–2010), American nuclear and astrophysicist
- Friedrich Goldmann (1941–2009), composer and conductor
- Carl Hahn (1926–2023), businessman, head of the Volkswagen Group
- Johannes Hähle (1906–1944), military photographer
- Peter Härtling (1933-2017), writer
- Richard Hartmann (1809–1878), important entrepreneur ("Saxon locomotive king")
- Frank Heinrich (born 1964), politician, member of the Bundestag
- Stephan Hermlin (1915–1997), writer
- Stefan Heym (1913–2001), writer and member of the Bundestag of the PDS
- Christian Gottlob Heyne (1729–1812), classical scholar and archaeologist
- Sigmund Jähn (1937–2019), first German astronaut (Interkosmos flight of August 26, 1978)
- John Kluge (1921–2010), German-American billionaire and media mogul
- Eva Kunz (1947–2023), politician
- Helga Lindner (born 1951), swimmer; Olympic silver medalist
- Max Littmann (1862–1931), architect
- Anja Mittag (born 1985), footballer, World Champion 2007
- Frederick and William Nevoigt, founders of the Diamant bicycle brand
- Carsten Nicolai (born 1965), contemporary artist
- Frei Otto (1925–2015), architect, architectural theorist and professor of architecture, builder of the Munich Olympic Park
- Sylke Otto (born 1969), luge
- Siegfried Rapp (1917–1977), one-armed German pianist
- Frederick Emil Resche (1866–1946), U.S. Army brigadier general[43]
- Frank Rost (born 1973), retired football goalkeeper
- Bruno Salzer (1859–1919), one of Chemnitz's leading entrepreneurs
- Aliona Savchenko, ice figure skater
- Helmut Schelsky (1912–1984), sociologist and university lecturer
- Karl Schmidt-Rottluff (1884–1976), painter and graphic artist of expressionism
- Maria Schüppel (1923–2011), composer and pioneering music therapist
- Christina Schultheiß (1918–2016), civil engineer, best known for her involvement in the Protestant church in East Germany.
- Matthias Schweighöfer (born 1981), actor and film director
- Jörg Schüttauf (born 1961), actor
- Nadja Stefanoff (born 1983), soprano
- Matthias Steiner (born 1982), German-Austrian weightlifter, Olympic gold medalist 2008
- Ingo Steuer (born 1966), figure skater
- Robin Szolkowy, ice figure skater
- Hans-Günther Thalheim (1924–2018), Germanist and linguist
- Johannes Thümmler (1906-2002), Obersturmbannführer
- Luise Emilie Tschersich (born 1998) actress
- Siegfried Vogel (born 1937), operatic bass
- Kurt Wagner (1904–1989), German general
- Katarina Witt (born 1965), figure skater
- Mandy Wötzel (born 1973), figure skater
- Klaus Wunderlich (1931–1997), organist
Twin towns – sister cities
Tampere, Finland (1961)
Ljubljana, Slovenia (1966)
Timbuktu, Mali (1968)
Ústí nad Labem, Czech Republic (1970)
Łódź, Poland (1972)
Mulhouse, France (1981)
Manchester, England, UK (1983)
Volgograd, Russia (1988)
Düsseldorf, Germany (1988)
Akron, United States (1997)
Taiyuan, China (1999)
Kiryat Bialik, Israel (2022)
Former twin cities:
Arras, France (1967 to 2021)
See also
References
- ^ a b Wahlergebnisse 2020 Archived 11 July 2021 at the Wayback Machine, Freistaat Sachsen, accessed 10 July 2021.
- ^ "Bevölkerung der Gemeinden Sachsens am 31. Dezember 2023 - Fortschreibung des Bevölkerungsstandes auf Basis des Zensus vom 15. Mai 2022 (Gebietsstand 01.01.2023)" (in German). Statistisches Landesamt des Freistaates Sachsen.
- ^ "Industriekultur-Geschichte".
- ^ "Chemnitz: Kulturhauptstadt mit Hindernissen". tagesschau.de (in German). Archived from the original on 11 January 2021. Retrieved 21 December 2021.
- ^ Eichler, Ernst; Walther, Hans, eds. (2001). Historisches Ortsnamenbuch von Sachsen. Band 1: A-L. Berlin: Akademie. p. 141.
- ^ Agricola, Georgius. De re metallica. Translation by Hoover, Herbert Clark and Hoover, Lou Henry, 1912, reprinted by Dover Publications, New York, 1950, pp. vi-xii.
- ^ Broué, Pierre (2006). The German Revolution: 1917 - 1923. Haymarket Books. p. 305. ISBN 1-931859-32-9.
- ^ W. Berthold, 'Die Kämpfeti der Chemnitzer Arbeiter gegen die militaristiche Reaktion im August 1919', Beiträge zur Geschichte der deutschen Arbeiterbewegung, no. 1, 1962, p. 127.
- ^ "Western Europe 1939–1945: Hamburg - Why did the RAF bomb cities?". The National Archives. Archived from the original on 17 April 2021. Retrieved 2 November 2017.
- ^ Victor, Edward. "Chemnitz, Germany". Archived from the original on 30 December 2009. Retrieved 23 March 2009.
- ^ "Graduate Computing Resources - Department of Computer Science". paul.rutgers.edu. Archived from the original on 5 December 2006. Retrieved 3 May 2008.
- ^ https://zensus2011.de/SharedDocs/Downloads/DE/Publikationen/Aufsaetze_Archiv/2015_12_NI_GWZ_endgueltig.pdf?__blob=publicationFile&v=4
- ^ Travel Guide, German Democratic Republic. Dresden: Zeit im Bild Publishing House. 1983. p. 89.
The town...was renamed Karl-Marx-Stadt in 1953 to commemorate the 135th anniversary of the birth and 70th anniversary of the death of...Karl Marx
- ^ Chemnitzer Tourismus-Broschüre, Herausgeber: City-Management und Tourismus Chemnitz GmbH, 4. Jahrgang • Ausgabe 12 • Sommer 2010 Archived 26 August 2010 at the Wayback Machine; O-Ton-Nachweis im Chemnitzer Stadtarchiv
- ^ "East Germany invited to join EC Dublin summit", The Times page 9, 2 June 1990
- ^ a b "Bauhaus-Universität Weimar: Institut für Europäische Urbanistik". www.uni-weimar.de. Retrieved 25 June 2025.
- ^ Dankwart Guratzsch: "Einer Stadt die Zähne herausgebrochen", Die Welt, 12 May 2006.
- ^ Gudrun Müller: "Der Abrissrausch ist tödlich für Chemnitz", Freie Presse, 7 December 2006.
- ^ Bennhold, Katrin (31 August 2018). "Chemnitz Protests Show New Strength of Germany's Far Right". The New York Times. Archived from the original on 1 September 2018. Retrieved 31 August 2018.
- ^ Eddy, Melissa (28 August 2018). "German Far Right and Counterprotesters Clash in Chemnitz". The New York Times. Archived from the original on 2 September 2018. Retrieved 31 August 2018.
- ^ Connolly, Kate (28 August 2018). "German police criticised as country reels from far-right violence". the Guardian. Archived from the original on 8 February 2019. Retrieved 4 September 2018.
- ^ Times, Oliver Moody, Berlin | The (2 September 2018). "Germany: Weekend of riots as thousands clash at far-right march in Chemnitz". The Sunday Times. ISSN 0956-1382. Archived from the original on 4 September 2018. Retrieved 4 September 2018.
{{cite news}}: CS1 maint: multiple names: authors list (link) - ^ Serrao, Marc Felix (3 September 2018). "Original wording: "Es gab, nach allem, was man weiss, lediglich vereinzelte Übergriffe, aber keine grossangelegte Menschenjagd (auch die NZZ hat hierüber zunächst in unzutreffender Weise berichtet)."". Neue Zürcher Zeitung (in German). Archived from the original on 5 September 2018. Retrieved 5 September 2018.
- ^ "Sachsens Ministerpräsident Kretschmer: "Es gab keinen Mob, keine Hetzjagd" - Freie Presse - Sachsen". Archived from the original on 5 September 2018. Retrieved 5 September 2018.
- ^ "Original wording: "65.000 bei Konzert gegen Rechts"". Archived from the original on 29 October 2018. Retrieved 3 October 2018.
- ^ "Original wording: "Totschlag in Chemnitz: Was wir über Tatverdächtige und Opfer Daniel H. wissen"". FOCUS online. Archived from the original on 3 October 2018. Retrieved 3 October 2018.
- ^ Serrao, Marc Felix (3 September 2018). "Original wording: "Die ostdeutsche Punkband Feine Sahne Fischfilet wurde jahrelang vom zuständigen Verfassungsschutz in Mecklenburg-Vorpommern beobachtet und tauchte unter dem Stichwort Linksextremismus (Rubrik: Autonome Antifa-Strukturen) in den Berichten der Staatsschützer auf."". Neue Zürcher Zeitung (in German). Archived from the original on 5 September 2018. Retrieved 5 September 2018.
- ^ "Original wording: "27 Minuten Hass auf Veranstaltung gegen Hass"". Bild (in German). 27 September 2018. Archived from the original on 18 January 2023.
- ^ A3, EAC (28 October 2020). "Chemnitz to be the European Capital of Culture 2025 in Germany". Creative Europe - European Commission. Archived from the original on 1 November 2020. Retrieved 28 October 2020.
{{cite web}}: CS1 maint: numeric names: authors list (link) - ^ Chemnitz, Staatliches Museum für Archäologie. "Staatliches Museum für Archäologie Chemnitz". www.smac.sachsen.de. Archived from the original on 3 March 2018. Retrieved 2 March 2018.
- ^ Chemnitz, City of. "SCHLINGEL International Film Festival". City of Chemnitz. Retrieved 19 January 2024.
- ^ a b "Monatsauswertung". sklima.de (in German). SKlima. Retrieved 17 October 2024.
- ^ "Chemnitz Climate Normals 1991–2020". National Oceanic and Atmospheric Administration. Archived from the original on 16 September 2023. Retrieved 16 September 2023.
- ^ "Hauptsatzung der Stadt Chemnitz" (PDF). Hauptsatzung der Stadt Chemnitz. Archived from the original (PDF) on 29 December 2010. Retrieved 30 August 2019. (PDF; 75 KB)
- ^ Baden-Württemberg, Statistisches Landesamt. "Aktuelle Ergebnisse – VGR dL". www.statistik-bw.de (in German). Archived from the original on 13 February 2019. Retrieved 8 September 2018.
- ^ "Detlef Müller". 28 September 2007. Archived from the original on 28 September 2007.
- ^ "Germany: States and Major Cities - Population Statistics, Maps, Charts, Weather and Web Information". citypopulation.de. Retrieved 25 June 2025.
- ^ "Statistisches Jahrbuch 2015/2016" (PDF) (in German). chemnitz.de. 29 June 2017. Archived (PDF) from the original on 17 June 2019. Retrieved 17 June 2019.
- ^ "Statistical Office of Saxony, Statistical data of June 2018 for academic winter term 2017" (PDF). Archived from the original (PDF) on 28 August 2018.
- ^ Khan, Sameer ud Dowla; Weise, Constanze (2013), "Upper Saxon (Chemnitz dialect)" (PDF), Journal of the International Phonetic Association, 43 (2): 231, doi:10.1017/S0025100313000145, archived (PDF) from the original on 28 January 2015, retrieved 7 June 2015
- ^ "Chemnitz orders electro-diesel tram-trains". Railway Gazette International. Archived from the original on 26 August 2012. Retrieved 19 August 2012.
- ^ "Chemnitz Cricket Club". USG Chemnitz e.V. abt Cricket Club. Archived from the original on 7 September 2017. Retrieved 27 June 2015.
- ^ Davis, Henry Blaine Jr. (1998). Generals in Khaki. Raleigh, NC: Pentland Press. pp. 306–307. ISBN 978-1-5719-7088-6. Archived from the original on 18 March 2023. Retrieved 30 October 2022 – via Google Books.
- ^ "Partnerstädte". chemnitz.de (in German). Chemnitz. Archived from the original on 30 October 2020. Retrieved 4 November 2020.
Bibliography
External links
Media related to Chemnitz at Wikimedia Commons
The dictionary definition of chemnitz at Wiktionary
Chemnitz travel guide from Wikivoyage- (in German) Official website




.jpeg)
_Burg.jpg)



