Cultural Park station
![]() Transfer node to Line 8 from Line 6  | ||||||||||||||||
| Chinese name | ||||||||||||||||
| Simplified Chinese | 文化公园站 | |||||||||||||||
| Traditional Chinese | 文化公園站 | |||||||||||||||
  | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Liwan District, Guangzhou, Guangdong China  | |||||||||||||||
| Coordinates | 23°06′33″N 113°14′56″E / 23.109186°N 113.248976°E | |||||||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||
| Line(s) | ||||||||||||||||
| Platforms | 4 (1 island platform and 1 split island platform) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| Other information | ||||||||||||||||
| Station code | 608 814 | |||||||||||||||
| History | ||||||||||||||||
| Opened | 28 December 2013 (line 6) 28 December 2019 (Line 8)  | |||||||||||||||
| Services | ||||||||||||||||
  | ||||||||||||||||
  | ||||||||||||||||
Cultural Park station (simplified Chinese: 文化公园站; traditional Chinese: 文化公園站; pinyin: Wénhuà Gōngyuán Zhàn) is an interchange station between Line 6 and Line 8 of the Guangzhou Metro. It is located underground in the Liwan District and started operation on 28 December 2013.[1]
Station layout
| G | - | Exits A, B, D, E | 
| L1 Concourse  | 
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities, Toilets | 
| L2 Equipment Area  | 
- | Station equipment | 
| L3 Line 6 Platforms  | 
Reserved Zone | Reserved for Line 8 | 
| Platform 2 | ||
| Island platform, doors will open on the left | ||
| Platform 1 |  6  towards Xiangxue (Yide Lu)  | |
| L4 Line 8 Platforms  | 
Platform 3 | |
| Side platform, doors will open on the left | ||
| Pedestrian Passageway | Passage linking Line 8 platforms | |
| Side platform, doors will open on the left | ||
| Platform 4 |  8  towards Wanshengwei (Tongfuxi)  | |
Exits
| Exit number | Exit location | |
|---|---|---|
| Exit A | Xidi Ermalu | |
| Exit B | Xidi Ermalu | |
| Exit D | Zhen'an Lu | |
| Exit E | Liu'ersan Lu | |
Gallery
- 
			
West concourse (Line 6) - 
			
South concourse (Line 8) - 
			
Platform 4 (Line 8 towards Wanshengwei) - 
			
Line 6 platform wall decoration - 
			
Culture wall - 
			
Exit A - 
			
Exit B 
References
- ^ Zheng, Xiaojia. "Guangzhou Metro Line 6 Scheduled to Open on Dec. 28". Life of Guangzhou. Guangzhou Interactive Information Network. Archived from the original on 27 January 2021. Retrieved 10 January 2014.
 
