KRI Lukas Rumkorem
![]() KRI Lukas Rumkorem during its launching ceremony
| |
| History | |
|---|---|
| Name | KRI Lukas Rumkorem |
| Namesake | Lukas Rumkorem |
| Builder | Noahtu Shipyard, Bandar Lampung |
| Cost | Rp 1.085 trillion |
| Yard number | 411[1] |
| Laid down | 16 November 2022 |
| Launched | 20 September 2024 |
| Identification | Pennant number: 392 |
| Status | Fitting out |
| General characteristics | |
| Type | Raja Haji Fisabilillah-class offshore patrol vessel |
| Displacement | |
| Length | 98 m (321 ft 6 in) |
| Beam | 13.5 m (44 ft) (breadth) |
| Height | 6.5 m (21 ft) |
| Draft | 4 m (13 ft) |
| Propulsion | 4 × MAN 16V28/33STC diesel engines, 7,280 kW (9,760 shp) |
| Speed | 28 knots (52 km/h) |
| Boats & landing craft carried | 2 × RHIBs |
| Complement | 70 (+24 extra personnel) |
| Sensors & processing systems | Havelsan Advent CMS |
| Electronic warfare & decoys | |
| Armament |
|
| Aircraft carried | 1 × helicopter |
| Aviation facilities | Flight deck and hangar |
KRI Lukas Rumkorem (392) is the second ship of Raja Haji Fisabilillah-class offshore patrol vessel to be operated by the Indonesian Navy.
Design
Unlike the class leader, Lukas Rumkorem initially was designed with a length of 60 m (200 ft), however during the construction it was redesigned to a length of 98 m (322 ft), the same as the class leader Raja Haji Fisabilillah.[2]
Service history
The ship's contract was awarded on 30 April 2020, with the contract worth Rp 1,085,090,000,000.[3] Its construction began with first steel cutting on 26 August 2021 at the then PT Daya Radar Utama (later renamed to PT Noahtu Shipyard) shipyard in Bandar Lampung, Lampung.[4][5]
The ship's keel was laid on 16 November 2022.[6] The ship experienced delays during its construction, which drew some criticism. Although the ship was planned to be handed over in 2023, the construction progress was only at 35% by March 2023.[3][7]
The patrol vessel was launched and officially given the name of Lukas Rumkorem on 20 September 2024.[8]
References
- ^ "Brigif 4 Marinir/BS Menghadiri Acara Keel Laying Kapal Offshore Patrol Vessel (OPV)". marinir.tnial.mil.id (in Indonesian). 16 November 2022. Retrieved 26 August 2024.
- ^ Ardiansyah, Yulian (18 November 2022). "PT DRU Letakkan Lunas Untuk Dua OPV Baru TNI AL". globalbusinesspress.net (in Indonesian). Retrieved 26 August 2024.
- ^ a b "Kinerja Kemenhan Jadi Sorotan, KPK Diminta Awasi Proyek Kapal OPV, Nilai Proyek 2 Triliun". merdekanews.co (in Indonesian). 11 April 2023. Retrieved 26 August 2024.
- ^ "Kemhan Pesan Kapal OPV dan OPV 90 Meter Buatan Dalam Negeri". kemhan.go.id (in Indonesian). 26 August 2021. Retrieved 26 August 2024.
- ^ "Brigif 4 Marinir/BS Menghadiri Acara Keel Laying Kapal Offshore Patrol Vessel (OPV)". mediafaktanews.com (in Indonesian). 17 November 2022. Archived from the original on 22 November 2022. Retrieved 26 August 2024.
- ^ Rusdiyono (13 April 2023). "Dua Petinggi Perusahaan Pembuatan Kapal OPV Masih Bungkam Soal Progres Proyek Milik Kementerian Pertahanan". infoindonesia.id (in Indonesian). Retrieved 18 September 2024.
- ^ Susanti, Anita (20 September 2024). "TNI AL KEMBALI DIPERKUAT DUA KAPAL OPV 90M & OPV BUATAN INDUSTRI DALAM NEGERI". pesonalampungnews.com (in Indonesian). Retrieved 20 September 2024.
_launching_ceremony.jpg)