Sources of Ohio utility-scale electricity generation in gigawatt-hours, full-year 2024:
[1]
- Natural gas: 85,417 (59.8%)
- Coal: 30,180 (21.1%)
- Nuclear: 17,947 (12.6%)
- Solar: 4,021 (2.81%)
- Wind: 2,865 (2.01%)
- Petroleum: 976 (0.68%)
- Other gases: 682 (0.48%)
- Hydroelectric: 504 (0.35%)
- Biomass: 279 (0.20%)
 This is a list of electricity-generating power stations in the U.S. state of Ohio, sorted by type and name.  In 2023, Ohio had a total summer capacity of 29,104 MW and a net generation of 133,223 GWh.[2] In 2024, the electrical energy generation mix was 59.8% natural gas, 21.1% coal, 12.6% nuclear, 2.8% solar, 2% wind, 0.7% petroleum and petroleum coke, 0.5% other gases, 0.4% hydroelectric, and 0.2% biomass.[1]
Ohio electricity generation by type
Natural gas
| Name | Location | Capacity (MW) | Owner | Type | Notes and links | 
| Guernsey Power Station | Byesville | 1875 | Caithness Energy | Natural gas combined cycle | Opened in 2023 | 
| Hanging Rock Energy Facility | Hanging Rock | 1430 | Dynegy | Natural gas combined cycle | [3] | 
| Lordstown Energy Center | Lordstown | 940 | Clean Energy Future, LLC | Natural gas combined cycle | Opened in 2018, second unit planned[4] | 
| Oregon Clean Energy Center | Oregon | 908 | Ares Management | Natural gas combined cycle | Opened in 2017 | 
| Rolling Hills Generating Station | Wilkesville | 865 | Rolling Hills Generating LLC | Natural gas simple cycle (5 units) |  | 
| Tait Electric Generating Station | Moraine | 681 | Kimura Power, LLC | Natural gas combined cycle | Opened in 1967[5] | 
| Waterford Energy Center | Waterford | 821 | Waterford Power, LLC | Natural gas combined cycle |  | 
| Carroll County Energy | Carrollton | 700 | Advanced Power | Natural Gas combined cycle | Opened in 2018[6] | 
| Washington Energy Facility | Beverly | 620 | Dynegy | Natural gas combined cycle |  | 
| Darby Generating Station | Mount Sterling | 480 | Darby Power, LLC | Natural gas simple cycle |  | 
| Middletown Energy Center | Middletown | 475 | NTE Energy | Natural gas combined cycle | Opened in 2018 | 
| West Lorain Plant | Lorain | 545 | Starwood Energy | Natural gas simple cycle |  | 
| Robert P Mone Plant | Convoy | 510 | Buckeye Power | Natural gas simple cycle |  | 
| Fremont Energy Center | Fremont | 707 | American Municipal Power | Natural gas combined cycle |  | 
| Dresden Plant | Dresden | 580 | American Electric Power | Natural gas combined cycle | Opened in 2012 | 
| Madison Peaking Station | Trenton | 677 | Duke Energy | Natural gas simple cycle |  | 
| Long Ridge Energy Terminal | Hannibal | 485 | Long Ridge Energy | Hydrogen - natural gas blend | Opened in 2021 [7] | 
Coal
Nuclear
Wind
Solar
| Name | Location | Capacity (MW) | Owner | Notes and links | 
| Bowling Green Solar Facility | Bowling Green | 20 | NextEra | [19] | 
| Napoleon Solar Facility | Napoleon | 3.54 | American Municipal Power | [19] | 
| Wadsworth Rittman Rd. Facility | Wadsworth | 2.625 | American Municipal Power | [19] | 
| Wadsworth Seville Rd. Facility | Wadsworth | 6.25 | American Municipal Power | [19] | 
| Wyandot Solar Facility | Upper Sandusky | 12 | Public Service Enterprise Group | Opened in 2010. | 
| Hardin I | Hardin County | 150 |  | Operational.[20] | 
| Hillcrest | Brown County | 200 |  | Operational.[20] | 
| New Market | Highland County | 100 |  | Operational.[20] | 
| Hardin II | Hardin County | 170 |  | Operational.[20] | 
| Yellowbud | Pickaway & Ross County | 274 |  | Operational.[20] | 
| Madison Fields | Madison County | 180 |  | Operational.[20] | 
| Willowbrook I | Brown County | 150 |  | Operational.[20] | 
| Nestlewood | Brown County | 80 |  | Operational.[20] | 
| Big Plain | Madison County | 196 |  | Operational.[20] | 
| Arche | Fulton County | 107 |  | Operational.[20] | 
| Hardin III | Hardin County | 300 |  | Operational.[20] | 
| AEUG Union | Union County | 325 |  | Operational.[20] | 
| Highland | Highland County | 300 |  | Operational.[20] | 
| Fox Squirrel | Madison County | 577 |  | Operational.[20] | 
| Atlanta Farms | Pickaway County | 200 |  | Operational.[20] | 
| Vinton | Vinton County | 125 |  | Approved for construction.[20] | 
| Alamo | Preble County | 69.9 |  | Approved for construction.[20] | 
| Angelina | Preble County | 80 |  | Approved for construction.[20] | 
| Powell Creek | Putnam County | 150 |  | Operational.[20] | 
| Wheatsborough | Erie County | 125 |  | Under construction.[20] | 
| Mark Center | Defiance County | 110 |  | Approved for construction.[20] | 
| Clearview | Champaign County | 144 |  | Operational.[20] | 
| Ross County | Ross County | 120 |  | Operational.[20] | 
| Cadence | Union County | 275 |  | Under construction.[20] | 
| Juliet | Wood County | 101 |  | Under construction.[20] | 
| Sycamore Creek | Crawford County | 117 |  | Under construction.[20] | 
| Marion County | Marion County | 100 |  | Under construction.[20] | 
| Union Ridge | Licking County | 107.7 |  | Approved for construction.[20] | 
| Tymochtee | Wyandot County | 120 |  | Approved for construction.[20] | 
| Nottingham | Harrison County | 100 |  | Approved for construction.[20] | 
| Wild Grains | Van Wert County | 150 |  | Approved for construction.[20] | 
| Dodson Creek | Highland County | 117 |  | Under construction.[20] | 
| Pleasant Prairie | Franklin County | 250 |  | Approved for construction.[20] | 
| Harvey | Licking County | 350 |  | Approved for construction.[20] | 
| Springwater | Franklin and Madison County | 155 |  | Approved for construction.[20] | 
| Border Basin | Hancock County | 120 |  | Approved for construction.[20] | 
| South Branch | Hancock County | 130 |  | Approved for construction.[20] | 
| Palomino | Hancock County | 200 |  | Approved for construction.[20] | 
| Blossom | Morrow and Marion County | 144 |  | Approved for construction.[20] | 
| Yellow Wood | Clinton County | 300 |  | Approved for construction.[20] | 
| Dixon Run | Jackson County | 140 |  | Approved for construction.[20] | 
| Oak Run | Madison County | 800 |  | Approved for construction.[20] | 
| Fountain Point | Logan County | 280 |  | Approved for construction.[20] | 
| Mink | Defiance & Paulding County | 140 |  | Approved for construction.[20] | 
| Clear Mountain | Clermont County | 152.2 |  | Approved for construction.[20] | 
Hydroelectricity
Battery storage
Closed plants
| Name | Location | Capacity (MW) | Owner | Type | Notes and links | 
| Ashtabula Power Plant | Ashtabula | 244 | FirstEnergy | Coal | Closed in 2015[23] | 
| W.C. Beckjord Power Station | New Richmond | 1304 | Duke Energy, DPL Inc., AEP | Coal (6 units) | Closed in 2014[24][25] | 
| R.E. Burger Power Station | Shadyside | 568 | FirstEnergy | Coal | Closed in 2011 | 
| Conesville Power Plant | Conesville | 2005 | AEP, AES/DPL Inc. | 6 units: coal & oil | Units 5-6 shut down in 2019 and Unit 4 closed in 2020.[3] | 
| Eastlake Power Plant | Eastlake | 1257 | FirstEnergy | Coal (units 1-5) / natural gas (unit 6) | Units 4-5 closed 2012, Units 1-3 closed in 2015, Unit 6 closed 2021.[23] | 
| O.H. Hutchings Station | Miamisburg | 414 | DPL Inc. | Coal | Closed in 2013[26] | 
| Richard H. Gorsuch Station | Marietta | 200 | American Municipal Power | Coal | Built by Union Carbide in 1951 as Marietta Steam Plant, sold to American Municipal Power in 1988 and renamed to Richard H. Gorsuch, closed in 2012. | 
| Killen Station | Wrightsville | 618 | AES/DPL Inc., Dynegy | Coal (1 unit) | Sold to AES 2012.[3] Closed in 2018. | 
| Lake Shore Power Plant | Cleveland | 245 | FirstEnergy | Coal | Closed in 2015[23] and demolished in 2017.[27] | 
| Muskingum River Power Plant | Beverly | 1375 | American Electric Power | Coal (5 units) | Closed in 2015[28] | 
| Philo Power Plant | Philo | 510 | Ohio Power | Coal | Closed in 1975; Philo Unit 6 was the first commercial supercritical steam-electric generating unit in the world,[29] and it could operate short-term at ultra-supercritical levels.[30] | 
| Picway Power Plant | Lockbourne | 220 | AEP | Coal | Closed in 2015 | 
| E.M. Poston Power Plant | Nelsonville |  | AEP | Coal | Closed in 1987 | 
| Shelby Municipal Light Plant | Shelby | 37 | City of Shelby | Coal (4 units) | Closed in 2013, power monitoring remains[31] | 
| Sidney Waterworks and Electric Light Building | Sidney |  | City of Sidney | Hydroelectric (1 unit) | Began generation in 1900[32] | 
| J.M. Stuart Station | Aberdeen | 2318 | AES/DPL Inc., Dynegy, and AEP | Coal (4 units) | Sold to AES 2012[3] Closed in 2018. | 
| Tidd Plant | Brilliant | 220 | Ohio Power | Coal | Retired in 1976. Was used as a demonstration for pressurized fluidized bed combustion (PFBC) for four years, 1991–1995. | 
| Toronto Power Plant | Toronto |  | Ohio Edison | Coal | Closed in 1993 | 
| Trash Burning Power Plant | Columbus |  | SWACO | Waste-to-energy | Closed in 1994 | 
| Avon Lake Power Station | Avon Lake | 680 | NRG Energy | Coal | Built in 1925–1926; closed in 2021; imploded in 2024[33] | 
| William H. Zimmer Power Station | Moscow | 1300 | Vistra Corp | Coal | Closed in May 2022.[14] | 
| W. H. Sammis Power Plant | Stratton, Ohio | 2,233 | FirstEnergy | Coal | Closed May 3, 2023 | 
See also
References
- ^ a b "Electricity Data Browser, Net generation for all sectors, Ohio, Fuel Type-Check all, Annual, 2001–24". www.eia.gov. Retrieved July 15, 2025.
- ^ "Ohio Electricity Profile". U.S. Energy Information Administration. Retrieved July 15, 2025.
- ^ a b c d "Dynegy Generating Facilities 2016" (PDF). Dynegy. Archived from the original (PDF) on February 4, 2017. Retrieved February 3, 2017.
- ^ "Lordstown Energy Center". Retrieved April 25, 2019.
- ^ "GLocal Energy Monitor". Retrieved January 17, 2025.
- ^ Power, Advanced. "Carroll County Energy Begins Commercial Operations". www.prnewswire.com. Retrieved May 31, 2018.
- ^ "Long Ridge Energy Terminal". Long Ridge Energy.
- ^ "Bay Shore Plant". Global Energy Monitor. Retrieved August 12, 2021.
- ^ "Cardinal Power Plant | Cardinal Operating Company". Archived from the original on November 7, 2024. Retrieved December 30, 2024.
- ^ State Electricity Profiles 2010 - 317 pages released January 2012 (PDF) (Report). U.S. Energy Information Administration - Dept. of Energy.
- ^ McLaughlin, Tim (March 2, 2021). "How private equity squeezes cash from the dying U.S. Coal industry". Reuters.
- ^ "Ovec-Ikec".
- ^ "Ohio consumer watchdog asks regulators to revisit coal plant bailouts". July 13, 2021.
- ^ a b "As Pleasants is mothballed, red flags for coal are flying". IEEFA.
- ^ "Locations". dynegy.com. Retrieved May 31, 2018.
- ^ Energy Information Administration (September 15, 2020). "Form EIA-860 detailed data with previous form data (EIA-860A/860B)". eia.gov. Archived from the original on September 18, 2020.
- ^ "Wind Power". www.amppartners.org. Retrieved November 23, 2020.
- ^ a b c d e f g h "Wind Status as of 9/17/2021" (PDF). Ohio Power Siting Board. Retrieved September 20, 2021.
- ^ a b c d "Solar Power". www.amppartners.org. Retrieved November 23, 2020.
- ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as "Solar Status as of 11/21/2024" (PDF). Ohio Power Siting Board.
- ^ a b c d e f g h i j k l m n o "Ohio - State Energy Profile Overview - U.S. Energy Information Administration (EIA)". www.eia.gov. Retrieved June 3, 2020.
- ^ "Meldahl Hydro Project". www.amppartners.org. Retrieved June 3, 2020.
- ^ a b c "FirstEnergy closes 104-year-old coal power plant, electric rates to rise (interactive map)". April 15, 2015. Archived from the original on November 6, 2017. Retrieved April 16, 2018.
- ^ "W C Beckjord Station - Power Plants - Duke Energy". Duke Energy. Retrieved April 16, 2018.
- ^ "Beckjord Station (Coal)". Duke Energy. Archived from the original on July 19, 2008. Retrieved July 14, 2008.
- ^ Levingston, Chelsey (March 8, 2014). "Potential for six power plants to operate in Butler County". Journal-News. Retrieved April 19, 2018.
- ^ Funk, John (February 23, 2017). "Lake Shore Plant's final demolition was overnight (vintage photos)". The Plain Dealer. Retrieved April 27, 2022 – via Cleveland.com.
- ^ "AEP Muskingum River plant closure hitting 62 jobs - Columbus - Columbus Business First". Archived from the original on May 24, 2015.
- ^ "Philo 6 Steam-Electric Generating Unit". ASME. Retrieved February 12, 2018.
- ^ "First U.S. Ultrasupercritical Power Plant in Operation". POWER Magazine. February 1, 2013. Retrieved February 12, 2018.
- ^ Graphics, Lantz Star. "Electricity & Communication Department". shelbycity.oh.gov. Retrieved May 13, 2018.
- ^ Owen, Lorrie K., ed.  Dictionary of Ohio Historic Places.  Vol. 2.  St. Clair Shores: Somerset, 1999, 1275.
- ^ Drown, Hannah (March 17, 2025). "Avon Lake Historical Society works to preserve memory of iconic power plant". The Plain Dealer. Retrieved March 17, 2025.