M25 expressway (Hungary)
| _Otszogletu_kek_tabla.svg.png) | |
|---|---|
| M25-ös autóút | |
|   in use | |
|  M25 near Eger | |
| Route information | |
| Length | 19 km (12 mi) | 
| Existed | 2018–present | 
| Major junctions | |
| From | _Otszogletu_kek_tabla.svg.png) M3 near Füzesabony | 
| 
 | |
| To | _Otszogletu_zold_tabla.svg.png) 252 in Eger | 
| Location | |
| Country | Hungary | 
| Counties | Heves | 
| Major cities | Eger | 
| Highway system | |
| 
 | |
The M25 expressway (Hungarian: M25-ös autóút) is a short north–south highway in Hungary. It connects the M3 motorway to the city of Eger.
Timeline
| Section | Length | Opened | Notes | 
|---|---|---|---|
| Kál (M3) – Andornaktálya | 14.5 km (9.01 mi) | 20 July 2020 | Segment South, built between 2018 – 2020. | 
| Andornaktálya – Eger | 4.0 km (2.49 mi) | 7 November 2018 | Segment North, built between 2017 – 2018. | 
Route description
- The route is full length expressway.  The maximum speed limit is 110 km/h, with  (2x2 lane road). (2x2 lane road).
| County | km | Type | Destination | Notes | |
|---|---|---|---|---|---|
|  Heves | 0 |   | _Otszogletu_kek_tabla.svg.png)  M3 / E71 – Budapest, Gyöngyös | The southern terminus of the  expressway. Kilometrage starting point | |
| 6 |   | Laskó híd | híd means Bridge | ||
| 7 |   | _Otszogletu_zold_tabla.svg.png) Main road 3 – Kerecsend / _Otszogletu_zold_tabla.svg.png) Main road 33 – Füzesabony | |||
| 10 |   | Main road 251 – Maklár, Bosch factory | |||
| 15 |   | _Otszogletu_zold_tabla.svg.png) Main road 253 – Mezőkövesd, Andornaktálya | |||
| 19 |   | _Otszogletu_zold_tabla.svg.png) Main road 252 – Eger Centrum, towards to _Otszogletu_zold_tabla.svg.png) Main road 25 → Ózd | The northern terminus of the expressway. | ||
| 1.000 mi = 1.609 km; 1.000 km = 0.621 mi 
 | |||||
Maintenance
The operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc. This activity is provided by this highway engineer.
Payment
Hungarian system has 2 main type in terms of salary:
1, time-based fee vignettes (E-matrica);
- Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024.[1]
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:
- Type of county vignette - Available section - Heves - full length (0 km – 19 km) 
See also
References
External links
- National Toll Payment Services Plc. (in Hungarian, some information also in English)
- National Infrastructure Developer Ltd. Archived 2018-06-12 at the Wayback Machine


