Newlincs EfW facility
| Newlincs EfW facility | |
|---|---|
![]() NewLincs EfW facility in 2008  | |
| Official name | NewLincs EfW facility | 
| Country | England | 
| Location | Lincolnshire, Yorkshire and the Humber | 
| Coordinates | 53°36′23″N 0°08′38″W / 53.6063°N 0.1439°W | 
| Commission date | 2004 | 
| Operator | NewLincs Developments Ltd | 
| Thermal power station | |
| Primary fuel | Waste | 
| External links | |
| Commons | Related media on Commons | 
grid reference TA229138  | |
The Newlincs EfW facility is an energy from waste facility which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.[1]
See also
References
- ^ "Your waste, our energy" (PDF). Archived from the original (PDF) on 28 September 2007., www.newlincs.com, Retrieved 22 February 2007
 
External links
Wikimedia Commons has media related to Newlincs EfW facility.


