Pemalang–Batang Toll Road
| Jalan Tol Pemalang–Batang | |
| Pematang Toll Road | |
![]() Pemalang-Batang Toll Road heading westbound in 2023 | |
| Route information | |
| Part of | |
| Maintained by PT Pemalang Batang Tol Road | |
| Length | 39 km (24 mi) |
| Existed | 2018–present |
| Major junctions | |
| West end | Pemalang |
| East end | Batang |
| Location | |
| Country | Indonesia |
| Major cities | |
| Highway system | |
Pemalang–Batang Toll Road or abbreviated to Pematang Toll Road, is a 39.2 kilometer controlled-access toll road that connects Pemalang area with Batang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java. The toll road is fully opened on November 9, 2018, by 7th President of Indonesia Joko Widodo.[1][2]
Sections
This toll road has two sections:[3]
- Section I: (Pemalang - Pekalongan), length 20,05
- Section II: (Pekalongan - Batang), length 16,7 km.
Toll gates
Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only
| Province | Location | km | mi | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|---|---|
| Central Java | Taman, Pemalang Regency | 0 | 0.0 | 312 | Pemalang Toll Gate | Western terminus | |
| Bojong, Pekalongan Regency | 19.14 | 11.89 | 331 | Bojong Toll Gate | |||
| Warungasem, Batang Regency | 29.74 | 18.48 | 341 | Batang Toll Gate | |||
| Kandeman, Batang Regency | 36.48 | 22.67 | 348 | Kandeman Toll Gate |
| Eastern terminus | |
| 36.60 | 22.74 | ||||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| |||||||
References
- ^ "Jokowi to Open 2 Toll Roads in Central Java Today". Tempo. Retrieved 9 November 2017.
- ^ "Proyek Jalan Tol Pemalang-Batang Bisa Dilintasi Lebaran 2017". Tempo. Retrieved 23 December 2017.
- ^ "Merak-Semarang Tersambung Tol Lebaran 2017, Begini Kondisi Lahannya". Detik. Retrieved 23 December 2017.
.jpg)