Qahir-class corvette
| Class overview | |
|---|---|
| Builders | VT Group, UK | 
| Operators |  Oman | 
| Planned | 2 | 
| Completed | 2 | 
| General characteristics [1] | |
| Class & type | Corvette | 
| Displacement | 
 | 
| Length | |
| Beam | 11.50 m (37 ft 9 in) | 
| Draught | 3.50 m (11 ft 6 in) | 
| Propulsion | 
 | 
| Speed | 31 kn (57 km/h; 36 mph) | 
| Range | 5,500 nmi (10,200 km; 6,300 mi) at 12 kn (22 km/h; 14 mph) | 
| Crew | 60 | 
| Sensors & processing systems | 
 | 
| Armament | 
 | 
The Qahir class is a class of two corvettes designed and built by VT Group in the United Kingdom for the Royal Navy of Oman.[2] The hull and superstructure has been designed with features including the cladding of surfaces with radar absorbent material and angled sides to reduce the radar cross section.[1][3]
Ships in Class
Oman placed an order for two corvettes from Vosper Thornycroft as part of Project Muheet on 5 April 1992, work beginning in September 1992. The two ships were completed in 1996, with the final ship, Al Mua'zzar being delivered to Oman and commissioned in 1997.[1][3]
| Ship | Pennant Number[1] | Laid Down[1] | Date Launched[1] | Date Commissioned[1] | 
|---|---|---|---|---|
| Qahir Al Amwaj | C 31 | 17 May 1993 | 21 September 1994 | 3 September 1996 | 
| Al Mua'zzar | C 32 | 4 April 1994 | 26 September 1995 | 13 April 1997[3] | 
See also
Notes and references
- Baker, A.D. (1998), The Naval Institute Guide to Combat Fleets of the World 1998–1999, Annapolis, Maryland, USA: Naval Institute Press, ISBN 1-55750-111-4
- Saunders, Stephen, Jane's Fighting Ships 2002–2003, Coulsdon, Surry, UK: Jane's Information Group, ISBN 0710624328
- Todd, Daniel; Lindberg, Michael (1996), Navies and Shipbuilding Industries: The Strained Symbiosis, Greenwood Publishing, ISBN 978-0-275-95310-2
External links