Trams in Duisburg
| Duisburg tramway network | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() NF4 tram at Dinslaken station, 2023. | |||||||||||||||||||||
| Operation | |||||||||||||||||||||
| Locale | Duisburg, Mülheim and Dinslaken, North Rhine-Westphalia, Germany | ||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
The Duisburg tramway network (German: Straßenbahnnetz Duisburg) is a network of tramways forming part of the public transport system in Duisburg, a city in the federal state of North Rhine-Westphalia, Germany.
Opened in 1881, the network has been operated since 1940 by the Duisburger Verkehrsgesellschaft (DVG) and is integrated into the Verkehrsverbund Rhein-Ruhr (VRR). It now forms part of the larger Duisburg Stadtbahn system, which in turn makes up part of the Rhine-Ruhr Stadtbahn system.
Lines
As of 2013, the Duisburg tramway network had the following lines:
| Line | Route | Travel time | Stops | Headway (rush hour) |
|---|---|---|---|---|
| 901 | Obermarxloh Schleife – Marxloh Pollmann – Beeck Denkmal – Laar Kirche – Scholtenhofstraße – Ruhrort Friedrichsplatz – Kaßlerfeld – König-Heinrich-Platz – Duisburg Hbf – Zoo/Uni – MH-Speldorf – MH Stadtmitte – Mülheim Hbf | 64 min | 46 | 7.5 / 15 min |
| 903 | Dinslaken Bf – Walsum Watereck – Marxloh Pollmann – Hamborn Rathaus – Meiderich Süd Bf – Duissern – Duisburg Hbf – König-Heinrich-Platz – Platanenhof – Hochfeld Süd Bf – Wanheim Rheintörchenstraße – Hüttenheim Mannesmann Tor 2 | 69 min | 45 | 7.5 / 15 min |
| Line sections with longer headways in italics | ||||
| Line 902 operates only during events at the Schauinsland-Reisen-Arena; the number 902 is also used to designate trams travelling to and from the Grunewald depot. | ||||
| (902) | (Walsum Watereck – Marxloh Pollmann – Hamborn Rathaus – Meiderich Süd Bf – Duissern – Duisburg Hbf – König-Heinrich-Platz – Platanenhof – Grunewald Betriebshof) | |||
Rolling stock
43 type GT10NC-DU trams are operated in Duisburg, which were built by Duewag from 1986 until 1993.[1] The first of 47 new Bombardier Flexity trams was delivered in 2020, which are scheduled to replace the old trams.[1]

See also
References
Notes
- ^ a b "Erste Bombardier Flexity Straßenbahn für Duisburg ausgeliefert" [First Bombardier Flexity tram delivered to Duisburg]. Urban Transport Magazine (in German). September 9, 2020. Archived from the original on September 11, 2020. Retrieved September 11, 2020.
Bibliography
- Höltge, Dieter (1994). Straßen- und Stadtbahnen in Deutschland [Tramways and Stadtbahnen in Germany] (in German). Vol. Band 4: Ruhrgebiet - Von Dortmund bis Duisburg [Volume 4: Ruhr - from Dortmund to Duisburg]. Freiburg i. B., Germany: EK-Verlag. ISBN 9783882553345.
External links
- Duisburg database / photo gallery and Duisburg tram list at Urban Electric Transit – in various languages, including English.
- Duisburg database / photo gallery at Phototrans – in various languages, including English.



