Tutow Solar Park
| Tutow Solar Park | |
|---|---|
| Country | Germany | 
| Location | Demmin | 
| Coordinates | 53°55′17″N 13°13′09″E / 53.92139°N 13.21917°E | 
| Status | Operational | 
| Commission date | 2009-2011 | 
| Solar farm | |
| Type | Flat-panel PV | 
| Site area | 22 ha (54.4 acres) Site plan | 
| Power generation | |
| Nameplate capacity | 52 MW | 
The Tutow Solar Park is in Demmin, Germany,[1] and is located at Tutow Airport.[2]
The first phase of the project, Tutow I was commissioned in 2009, using 91,200 First Solar thin film modules, with a total rating of 6782 kWp, and was expected to produce 6.7 GWh per year.[3] The second, Tutow II, brought the total to 25.4 MWp, about four times larger, in 2010,[4] and was expected to produce 26 GWh/year using a total of 335,400 panels, and the third section, Tutow III, making the total 52 MWp, was completed in 2011.[5]