Upper Hugdi Hydropower Station
| Upper Hugdi Hydropower Station | |
|---|---|
|   Location of Upper Hugdi Hydropower Station in Nepal | |
| Official name | Upper Hugdi Hydropower Project | 
| Country | Nepal | 
| Location | Gulmi District | 
| Coordinates | 28°05′00″N 83°25′17″E / 28.08333°N 83.42139°E | 
| Purpose | Power | 
| Status | Operational | 
| Owner(s) | Ruru Jalbidyut Pariyojana Pvt. Ltd | 
| Dam and spillways | |
| Type of dam | Gravity | 
| Impounds | Hugdi River | 
| Commission date | 2071-12-09 BS | 
| Type | Run-of-the-river | 
| Installed capacity | 5 MW | 
Upper Hugdi Hydropower Station (Nepali: माथिल्लो हुगदी जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Gulmi District of Nepal. The flow from Hugdi River is used to generate 5 MW electricity. The plant is owned and developed by Ruru Jalbidyut Pariyojana Pvt. Ltd, an IPP of Nepal. The plant started generating electricity from 2071-12-09BS. The generation licence will expire in 2104-04-29 BS, after which the plant will be handed over to the government. [1] The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.[2]
See also
References
- ^ "Operating Projects- Hydro (Above 1MW)".
- ^ Annual Report 2019/2029. Nepal Electricity Authority.