Chegongzhuang station
![]() Line 2 platform  | ||||||||||||||||
| General information | ||||||||||||||||
| Location | West 2nd Ring Road and Chegongzhuang Street (车公庄大街) / Ping'anli West Street (平安里西大街) Chegongzhuang, Xicheng District, Beijing China  | |||||||||||||||
| Coordinates | 39°55′56.45″N 116°21′20.62″E / 39.9323472°N 116.3557278°E | |||||||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
| Line(s) | ||||||||||||||||
| Platforms | 4 (1 split island platform and 1 island platform) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| Other information | ||||||||||||||||
| Station code | 202 (line 2) | |||||||||||||||
| History | ||||||||||||||||
| Opened | September 20, 1984 (line 2) December 30, 2012 (line 6)  | |||||||||||||||
| Services | ||||||||||||||||
  | ||||||||||||||||
  | ||||||||||||||||
Chegongzhuang station (simplified Chinese: 车公庄站; traditional Chinese: 車公莊站; pinyin: Chēgōngzhuāng Zhàn) is an interchange station on Line 2 and Line 6 of the Beijing Subway.[1] The station is on intersection of Chegongzhuang Street and the West 2nd Ring Road. It provides direct access to Guanyuan Park.
Station layout
Both the line 2 and 6 stations have underground island platforms. Line 6 has a split island platform, whilst line 2 has a normal island platform.
Exits
There are 5 exits, lettered A, B, C, E, and H. Exits C and H are accessible.[2][3]
Future Development
It will be the Southern terminus of Line 13A. Construction of Chegongzhuang station on Line 13A started on 20 April 2024.[4]
Gallery
- 
			
Line 2 platform - 
			
Line 2 platform in May 2010 - 
			
Line 2 platform - 
			
Line 2 platform in December 2020 - 
			
Stairs to exit C - 
			
Line 2 exit - 
			
 - 
			

 - 
			
Interchange to Line 6. - 
			Passengers boarding a westbound line 6 train
 - 
			
Line 6 concourse - 
			
Line 6 platform - 
			
Eastbound line 6 platform - 
			
Eastbound line 6 platform with escalator to exits A, E, and H to the right - 
			
Eastbound line 6 platform in November 2016 - 
			Line 6 concourse
 - 
			Line 6 train at Chegongzhuang station
 - 
			
Westbound line 6 platform facing east - 
			
Corridor to the eastbound line 6 platform 
Notes
- ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
 - ^ "车公庄站(6号线)".
 - ^ "车公庄站(2号线)".
 - ^ "中铁十六局集团一周要闻(2024.4.15-4.21)". 2024-04-22. Archived from the original on 2024-06-11. 
4月20日,地铁公司承建的北京轨道交通扩能提升工程13号线01标项目正式破土动工,标志着该工程进入实质性施工阶段
 
Wikimedia Commons has media related to Chegongzhuang Station.
.jpg)
![Chegongzhuang[1] is located in Beijing](./_assets_/China_Beijing_adm_location_map.svg.png)