Montreuil–Hôpital station
Montreuil–Hôpital | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Platforms on opening day | |||||||||||
| General information | |||||||||||
| Location | Montreuil, Seine-Saint-Denis Île-de-France France | ||||||||||
| Coordinates | 48°52′42″N 2°27′17″E / 48.8783°N 2.45461667°E | ||||||||||
| Owned by | RATP | ||||||||||
| Operated by | RATP | ||||||||||
| Line(s) | |||||||||||
| Platforms | 2 (2 side platforms) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Accessible | Yes | ||||||||||
| Architect | Richez Associés[1] | ||||||||||
| History | |||||||||||
| Opened | 13 June 2024 | ||||||||||
| Services | |||||||||||
| |||||||||||
| Future services | |||||||||||
| |||||||||||
| |||||||||||
Montreuil–Hôpital station (French pronunciation: [mɔ̃tʁœj opital]) is a station on Line 11 of the Paris Métro. The station serves the André Grégoire Hospital in Montreuil and opened on 13 June 2024.[2][3] An extension of Line 9 to the station is planned with an unknown date of completion.
The station was designed by architects Richez Associés, who also designed 3 other stations on the extension.[4]
References
- ^ "4 stations for metro line 11 extension". Retrieved 14 June 2024.
- ^ "Ligne 11 Prolongement - Mairie des Lilas > Rosny-Bois-Perrier". Île-de-France Mobilités (in French). 19 April 2023. Retrieved 26 April 2023.
- ^ "Focus on the extension of line 11" (Press release). RATP Group. 13 June 2024. Retrieved 2024-06-13.
- ^ "4 stations for line 11 extension". www.richezassocies.com. Retrieved 2024-06-14.
_-_2024-06-13_-_10.jpg)
